History and structure of the company :

The company was founded in Iraq, and since its establishment ,it has started to obtain a lot of achievements, contributed to Ard El-Zubair in the establishment and construction of many of the main and vital roads of El- Basra and southern Iraq with several departments, companies , ministries of the State and oil licensing companies working with the South Oil Company.

Since the first year of establishment, a specialized team of consultants and engineers specializing in civil and architectural engineering have been provided, in addition to a full staff of specialized and experienced technicians.

The Company has a long record of successes since its first year of establishment, thanks to Allah at first and then the efforts of its technical and administrative team.

 Ard El-Zubair has implemented many projects, for example:

  1. Works executed with the South Oil Company:

    • Construction and paving of the internal roads of Al – Ratka isolation station .
    • Maintenance and paving the service road of the strategic pipeline from Nazem Shatt al-Basra to Hamdan with a length of 16.5 km.
    • Construction and paving of the new Burjisiya residential road.
    • The construction and implementation of dozens of oil wells bases with the methods of their own servants in the fields of El-Hemar and North El-Zubair and Rumaila South and North and the field of Al-Luhais and Artawi.

  2. The implementation of the contract works 334/2011 with the South Refineries Company, a project to replace and expand the entrance road to the Shuaiba Refinery, which reaches the company with international and standard specifications, especially the nature of the road and the loads and high weights passing it to the South Refineries Company.
  3. Work carried out with the Bureau of El-Basra Governorate / Directorate of Government Contracts. 

    • Tender works (30 / Municipalities / 2011 Project) Rehabilitation of the road between the fuel station of Alaoua and Falka step in Zubair district.
    • Tender works (68 / Municipalities / 2013) Project for the construction of dirt roads and spice in the district of Zubair.
    • Tender work (42 / a / municipalities / 2013) project to establish 9 streets in the district of Abu al-Khasib.
    • Tender work (16/30 / Municipality / 2013) project to complete the paving of the streets of the Sai district from the Red Bridge to the bridge of the courts with sewage work.
    • Tender works (133 / Diwan / 2013) Project maintenance and paving of the Sbytia blockage.
    • Tender works (1 / Electricity / 2017) The project of paving the streets of the new residential neighborhood at the power plant of Haritha.

  4. The execution of two contracts with the company BGP Chinese ECNC oil / Iraq branch, where the site set up several control towers and the implementation of a network of dirt service roads in the field of South and North El-Rumaila.
  5. Implementation of dozens of oil wells with the El-Rumaila operation in the South and North field of El-Rumaila.
  6. Processing and implementation of earthworks with Russian company “Lukoil” and Samsung Korea in the West Qurna oil field .
    Direct invitations have been sent to our company to participate in the tenders as indicated in the attached documents within the jurisdiction of our company (works of roads, bridges and earthworks) ,as our company owns factories, equipment, trained staff and specialized mechanisms within our field mentioned above and as below:

    • Ministry of Construction and Housing/General.
    • Directorate of Government Contracts in El– Basra.
    • South Refineries Company.
    • Rumaila Operating Authority.
    • Italian company Eni.
    • Russian Lukoil Company.
    • Authority for Roads and Bridges.
    • BGP Chinese CNBC oil company/Iraq branch.